Welcome to
PT. Mitus Pratama Consultant

Free Member
PT. Mitus Pratama Consultant
Indonesia
  • Cooperation

    Harga Pekerjaan

    Harga Pekerjaan

    Price:
    Nego
    Quantity Order:
    Origin:
    Indonesia
    Payment Method:
    Telegraphic Transfer (T/T)

    Specification :

    PRICES :
    DESK STUDY
    Product:
    Desk Study Report, the following maps: Orientation, Accessibility, Land Use Map, Radar Satellite Imagery, land slope, soil type, Land Suitability and Potential Land Area Map ( Map Scale 1: 100, 000 s / d 1: 500.000)
    Functions: Guidelines for Location permit.
    Time: 1-2 weeks
    Price : 7-10 million rupiahs ( negotiable)

    BLOCK DESIGN SURVEY
    Product:
    Block Design Survey Report and Maps:
    Accessibility, Topography, Slope, Observation of Land Use Map, Hydrology, Soil Type, Soil Map Units, and Land Suitability Analysis Tread.
    Spatial Plan Gardens ( Map Scale 1: 25, 000 s / d 1: 50, 000) .
    Volume of building plans ( hectare Statement & Infrastructure Plan) .
    Function: Estate Blue Print.
    Time: 2-3 Months
    Price : 10000-20000 rupiah / Ha ( Negotiable)

    BLOCKING SURVEY
    Activities:
    Take measurements and application ( setting out) Block Design Survey results on the field according to the stages of development.
    Fixing block boundaries
    Enclosure as road
    Spatial correction Estate Design ( if necessary)
    Product:
    In the field mounted block boundaries ( as roads)
    Report blocking book and maps:
    Map of Garden Block 1: 20, 000
    Land Use Plan ( Statement hectare)
    Infrastructure maps 1: 20, 000
    Volume plan the construction of roads, bridges, culverts, etc.
    Purpose:
    As a reference work for the implementers / contractors.
    As a basis for management to plan the volume and the overall cost of each stage ( year) .
    Time: As needed
    Price : 50000-40000 rupiah / Ha

    Mapping PROGRESS Survey
    Conduct extensive measurements of the estate and block network infrastructure already built.
    To measure the volume of Infrastructure.
    Mapping the entire construction of the estate.
    Product:
    Mapping Progress Reports Books and maps:
    Overview Map ( Scale 1: 100, 000)
    Realization of Block Estate Map ( Scale 1: 20, 000)
    Infrastructure Map ( 1: 20, 000)
    Afdeling map ( 1: 40, 000)
    The area of Block List.
    List Volume Infrastructure.
    Purpose:
    As a reference to the payment of both the contractor and self-management executive.
    As a basis for farm management:
    Monitoring of production
    Treatment plant
    Countermeasures pest
    Replanted
    Man power planning
    Assessed production etc.
    Time: 2-3 Months
    Price : 35000 rupiah / ha ( negotiable)

    FACTORY AND TOPOGRAPHY SURVEY EMPLASMENT
    Activities:
    Finding the location of the factory / emplasment.
    To measure the horizontal frame.
    To measure the vertical frame.
    Details make the measurement situation.
    Observing the situation topographical detail of the planned location of the factory / emplasment.
    Product:
    Report Books and Maps:
    Topographic Maps ( scale 1: 1000 / 1: 500, contour interval 0, 5 m to 1 m) .
    Situation Map Trace the main road ( scale 1: 2, 000) .
    Overview Map ( scale as needed) .
    Purpose:
    As a basis for planning factory layout / emplasment and infrastructure ( office factory / farm employee housing, social facilities and public facilities)
    Time: 1-1, 5 month
    Price : 60-75 million rp./ pack ( negotiable)

    LAY OUT AND FACTORY EMPLASMENT
    Activities:
    Spatial planning Factory / Emplasment and infrastructure include:
    Core Building Factory.
    Loading Ramp.
    Waste Management.
    The reservoir.
    Office of the Factory / estate, gatehouse, guest house, employee housing factory / estate, social facilities and public facilities etc.

    Product:
    Book Report Spatial Factory / Emplasment and map:
    Spatial maps Factory / Emplasment, facilities, soil test point.
    Working drawings of each building type.
    Purpose:
    Basis to permit the location of the plant.
    Basic investigation of soil bearing capacity.
    Basic details of factory planning / emplasment and infrastructure.
    The basis for the implementation of dig Hide ( cut & fill) .
    Basic guidelines for the implementation of development in the field.
    Time: 2-3 Months
    Price : 100 million rp / pack ( Negotiable)



You have [3] new inquiries.
Go to Member Menu

Home - Trade List - Product List - Inquiry List - Cooperation List - Company List
Copyright © 2024 Indotrade.co. All Rights Reserved.