Free Member
Contact Information
Name:
Mr. MEDIYANTO HERY ISMOYO
[Marketing]
E-mail:
Phone Number:
Phone number of Mr. MEDIYANTO HERY ISMOYO at SIDOARJO
Mobile Number:
Mobile number of Mr. MEDIYANTO HERY ISMOYO at SIDOARJO
Fax Number:
Fax number of Mr. MEDIYANTO HERY ISMOYO at SIDOARJO
Address:
Jln.Teratai 31 Ketajen-Gedangan
SIDOARJO 61254, Jawa Timur
Indonesia
Average User Review

There is no review for this company

Cooperation

PENGADAAN JASA PEMBANGUNAN JARINGAN KABEL TEMBAGA TELEKOMUNIKASI[Oct. 26, 2011 6:02:13]
Pricecompetitive cheap
Quantity Order:
Payment MethodTelegraphic Transfer (T/T), Cashier Order, Bank Cheque
Quantity1
Pack. & DeliveryEmployment packet
OriginIndonesia
Recommend to your friends
Specification
COMPANY PROFILE:
CV. KARYA MANDIRI is a national private company with a business engaged in the Procurement of Goods / services and contractors, particularly the construction of infrastructure facilities and maintenance of telecommunications and cable networks.

Since its founding in Date 12 MEI 2005 CV. KARYA MANDIRI have participated in the development of telecommunications network infrastructure in East Java, Central Java, Borneo, Bali, Indonesia Mataram and other areas.

GENERAL COMPANY:
CV. KARYA MANDIRI was founded on May 12, 2005 Date of Ratification with the deed Certification Number:
268 / 268 / CV / V / 2005, - before
Notary Nurjanah DEWI, SH. are addressed in Sidoarjo - EAST JAVA

ITS LEGALITY.
Number of offices: a headquarters.
Addressed in
Jln.Teratai 31 RT 001 / RW 001 KETAJEN, Gedangan District, Sidoarjo regency, East Java Province.
TIN NUMBER; 02.391.748.7-643.000
Registered membership in the Association of National Telecommunication Company ( APNATEL) in 2008 with Registration number 2-3515-4-13-1-13-021115 membership

OWNERSHIP:
CV. KARYA MANDIRI in the acquisition of resources taken from a privately held company by 100% .

Its business operations in the implementation of the CV. KARYA MANDIRI is supported by the Board of Directors and employees as many as 13 people, with details: S1 2 People, Senior equals 10 people. As an expert in the field of telecommunication networks as many as 10 people, and Financial Management expert 2 people, experts In the field of Marketing 1 person, To support the implementation of a job ( project) , we also recruit a number of honorary loose customized to the needs and supported the work of the complete equipment & HR professionals.
the different types of jobs we used to do diantarannya follows:

NO JOB DESCRIPTION & SPECIFICATION PRICE ENGINEERING UNIT VOL SAT

I WITHDRAWAL CABLE Duct:
1 Capacity 200 " / 0.6 Meters 1 1344
2 Capacity 300 " / 0.6 Meters 1 1344
3 Capacity 400 " / 0.6 Meters 1 1542
4 Capacity 600 " / 0.6 Meters 1 2000
5 Capacity 800 " / 0.6 Meters 1 2000
6 Capacity 1000 " / 0.6 Meters 1 2670
Capacity 1200 7 " / 0.6 Meters 1 2700
Capacity 1400 8 " / 0.6 Meters 1 3000

WITHDRAWAL CORD II Duct:
1 Capacity 200 " / 0.8 Meters 1 1638
2 Capacity 300 " / 0.8 Meters 1 1638
3 Capacity 400 " / 0.8 Meters 1 1725
4 Capacity 600 " / 0.8 Meters 1 2100

III WITHDRAWAL CABLE DIRECT PLANTING SOIL ( KTTL) :
1 Capacity 10 " / 0.6 Meters 1300
2 Capacity 20 " / 0.6 Meters 1350
3 Capacity 30 " / 0.6 Meters 1540
4 Capacity 40 " / 0.6 Meters 1540
5 Capacity 50 " / 0.6 Meters 1540
6 Capacity 60 " / 0.6 Meters 1600
7 Capacity 80 " / 0.6 Meters 1774
8 Capacity 100 " / 0.6 Meters 1774
9 Capacity 200 " / 0.6 Meters 1 1050
10 Capacity 300 " / 0.6 Meters 1 1050
11 Capacity 400 " / 0.6 Meters 1 1440
12 Capacity 500 " / 0.6 Meters 1 1440
13 Capacity 600 " / 0.6 Meters 1 1620
14 Capacity 800 " / 0.6 Meters 1 1680

IV PLANTING GROUND CABLE DIRECT WITHDRAWAL ( KTTL) :
1 Capacity 10 " / 0.8 Meters 1336
2 Capacity 20 " / 0.8 Meters 1402
3 Capacity 30 " / 0.8 Meters 1600
4 Capacity 40 " / 0.8 Meters 1600
5 Capacity 50 " / 0.8 Meters 1600
6 Capacity 60 " / 0.8 Meters 1672
7 Capacity 80 " / 0.8 Meters 1780
8 Capacity 100 " / 0.8 Meters 1780
9 Capacity 200 " / 0.8 Meters 1 1080
10 Capacity 300 " / 0.8 Meters 1 1080
11 Capacity 400 " / 0.8 Meters 1 1612
12 Capacity 500 " / 0.8 Meters 1 1612
13 Capacity 600 " / 0.8 Meters 1 1800
14 Capacity 800 " / 0.8 Meters 1 1818

WITHDRAWAL V CABLE AIR:
1 Capacity 10 " / 0.6 Meters 1462
2 Capacity 20 " / 0.6 Meters 1462
3 Capacity 30 " / 0.6 Meters 1462
4 Capacity 40 " / 0.6 Meters 1510
5 Capacity 50 " / 0.6 Meters 1510
6 Capacity 60 " / 0.6 Meters 1510
7 Capacity 80 " / 0.6 Meters 1552
8 Capacity 100 " / 0.6 Meters 1552

VI WITHDRAWAL CABLE AIR:
1 Capacity 10 " / 0.8 Meters 1504
2 Capacity 20 " / 0.8 Meters 1504
3 Capacity 30 " / 0.8 Meters 1504
4 Capacity 40 " / 0.8 Meters 1558
5 Capacity 50 " / 0.8 Meters 1558
6 Capacity 60 " / 0.8 Meters 1558
7 Capacity 80 " / 0.8 Meters 1606
8 Capacity 100 " / 0.8 Meters 1606

SWITCHING VII STRAIGHT / BRANCH CABLE SYSTEM WITH MECHANICAL Duct:
1 Capacity 100 " Point 1 111 800
2 Capacity 200 " Point 1 194 600
3 Capacity 300 " Point 1 257 000
4 Capacity 400 " Point 1 320 000
5 Capacity 500 " Point 1 385 500
6 Capacity 600 " Point 1 445 500
7 Capacity 800 " Point 1 579 500
8 Capacity 1000 " Point 1 696 500
9 Capacity 1200 " Point 1 822 500
10 Capacity 1400 " Point 1 947 250

SWITCHING VIII STRAIGHT / BRANCH KTTL SYSTEM WITH MECHANICAL:
1 Capacity 10 " Point 1 16 500
2 Capacity 20 " Point 1 33 100
3 Capacity 30 " Point 1 41 500
4 Capacity 40 " Point 1 46 150
5 Capacity 50 " Point 1 50 800
6 Capacity 60 " Point 1 55 500
7 Capacity 80 " Point 1 65 000
8 Capacity 100 " Point 1 73 000
9 Capacity 200 " Point 1 120 000
10 Capacity 300 " Point 1 166 650
11 Capacity 400 " Point 1 175 000
12 Capacity 500 " Point 1 232 000
13 Capacity 600 " Point 1 280 000
14 Capacity 800 " Point 1 405 000

SWITCHING IX STRAIGHT / BRANCH CABLE AIR:
1 Capacity 10 " Point 1 10 700
2 Capacity 20 " Point 1 21 280
3 Capacity 30 " Point 1 31 920
4 Capacity 40 " Point 1 42 650
5 Capacity 50 " Point 1 47 800
6 Capacity 60 " Point 1 54 500
7 Capacity 80 " Point 1 61 850
8 Capacity 100 " Point 1 74 500

X TERMINATION OF CABLE SYSTEMS PRESS Insert
1 In 1468 Pair MDF
2 In RK Pair 1522
3 In DP Pair 1690

XI WORK IN CABINET / RK:
1 Create a 1: 3: 5 Reinforced Concrete Foundations & Psng CAB. Lkp.U / 2400 " ( M + J) Fruit 1 405 000
2 Create a 1: 3: 5 Reinforced Concrete Foundations & Psng CAB. Lkp.U / 4800 " ( M + J) Fruit 1 466 800
3 Attach the Grounding Cabinet 3 poles ( Service) + Test Set 1 30 000
4 Create / Replace stilt Security ( M + J) / Without Foundations Fruit 1 84 600
5 Labeling / Penomeran With Cat In RK ( M + J) Fruit 1 12 960
6 Author stilt Safety Foundation Reinforced Concrete 1: 3: 5 ( M + J) 1 1.08 million M3
7 Attach Kermik KW-1 In Wall and Floor Work Foundations RK ( M + J) M 2 1 64 200
8 Replace Paving Work On Floor RK ( M + J) M 2 1 38 400
9 Unloading Foundations and Floor Work RK Fruit 1 38 700
10 Unloading Patak Safety Set 1 22 800
11 Jumper in RK SST 1360
12 Replace the BMF 11 Way Fruit 1 1080
13 Replace the BMF 21 Way Fruit 1 1320
14 Replace the BMF 31 Way Fruit 1 1440
15 Fixing Floor Work RK / Cabinet ( M + J) Ceramic KW-1 M2 1 76 800
16 Fixing Floor Work RK / Cabinet ( M + J) Paving M2 1 38 400
17 Painting RK - 2400 and Labelling ( M + J) Fruit Spray System 1 136 800
18 Painting RK - 4800 and Labelling ( M + J) Fruit Spray System 1 152 000
19 Parafinasi RK-2400 ( M + J) Fruit 1 87 000
20 Parafinasi RK-4800 ( M + J) Fruit 1 110 400
21 Replace Duct Cable clamps ( 2 pieces) Fruit 1950

XII WORK in the DP:
1 Connect the DP 10 " / 20" On Pole ( Service) Fruit 1 3643
2 Attach the DP 10 " / 20" On the Wall ( Service) Fruit 1 5288
3 Attach the Pillar DP 10 " / 20" & 42 000 Making a Fruit Foundation
4 Replace the DP Kap.30 " s / d 100" On the Wall ( Service) Fruit 1 7050
5 Replace Grounding of the DP End ( Service) Set 1 22 500
6 Unloading DP On Pole, Wall, Pillar Fruit 1 3055
7 Penomeran DP with Cat ( M + J) Fruit 1 4230
8 Replace the climbing Pillar ( 2 fruit) ( Services) Set 1 1821
9 Plug Riser Pipe & Clamps ( Services) Set 1 3231
10 Put Guedring & Plastic Belt ( Service) Set 1911
11 Replace the Pole Strap HRWL ( Service) Fruit 1911
12 Put Pole Strap Type Y ( Service) Fruit 1911
13 Unloading at Pillar pedestal Accessories: Pole Strap HRWL Fruit 1588
14 Unloading Accessories at Poles pedestal: Type Y Fruit 1588
15 Unloading Accessories at Poles pedestal: Guedring Fruit 1323
16 Unloading Accessories at Poles pedestal: Riser Pipe & Clamps Fruit 1 1645
17 Plug Pole Pole Strap on PLN / Concrete ( Services) Fruit 1 2115

XIII POLE WORK:
1 Iron Pole Planting 7Mtr ( dg foundation Cat + ) Bars 1 39 050
2 Iron Pole Planting 9Mtr ( dg foundation Cat + ) Bars 1 47 500
3 Pole Concrete Plant 9M s / d 13m ( with foundation) Bars 1 49 500
4 Unloading Iron Pillar 7M s / d 9M ( dg foundation) Bars 1 19 250
5 Unloading Pole Concrete 9M s / d 13m ( dg foundation) Bars 1 19 800
6 Unloading Pole Concrete 9M s / d 13m ( Without Foundations) Bars 1 19 250
7 Painting Pole ( M + J) Trunk 1 16 500
8 Making Foundations Pole ( M + J) Fruit 1 13 750
9 Enforcement of the Iron Pillar Leaning Straight Route ( DW / KU) Bars 1 11 275
10 Enforcement of Concrete Pole Leaning Straight Route ( DW / KU) Bars 1 18 700
11 Enforcement of the Iron Pillar Route Tilt Angle ( DW / KU) Bars 1 17 050
12 Enforcement Pillar Route Concrete Tilt Angle ( DW / KU) Bars 1 27 500
13 DP Enforcement Pillar ( Pillar of Iron) Bars 1 23 100
14 Replacement Pole pedestal DW / KU ( Pillar of Iron) Bars 1 58 300
15 Penomeran Pole ( M + J) Trunk 1 4070

Gabby XIV WORK ( SERVICE) :
1 Put gabby Pull In Iron Pole Set 1 33 000
2 Attach the garrulous Tunjang / prop In Iron Pole Set 1 39 050
3 Attach the garrulous Labrang In Iron Pole Set 1 72 050
4 Unloading gabby Pull In Iron Pole Set 1 5500
5 Unloading gabby Tunjang / prop In Iron Pole Set 1 4950
6 Unloading gabby Labrang In Iron Pole Set 1 24 750
7 Casting foundation gabby Tunjang / chock The Iron Pillar of Fruits 1 13 750

XV WORK on MDF - CABLE CHAMBER:
1 Labelling Cable Duct ( Laminating) uk. 7X11 cm dg Fruit Tie a 5463 Rape
2 Attach the K-71 ( Service) Fruit 1 3105
3 Attach the Duct Seal ( Service) Fruit 1 4255
4 Attach the Stopper Duct ( Service) Fruit 1 1035
5 Painting Re-Cable Chamber ( M + J) M 2 1 20 000
6 Install Ceramic KW-1 uk. 20x20 On Wall Chamber ( M + J) M 2 1 58 850

XVI WORK manhole / HANDHOLE:
A Supporting Work:
Fruit 1 1 30 800 Drain manhole
2 1 12 500 Drain Handhole Fruit
3 rodding, Cheking, Claening including leguminous Duct Plug Fishing Ropes Plastic 1 cm ( M + J) Meter 1 1500
4 Validation of the manhole including Pelebelan Duct Cable ( including Multiple Recoding 3) 9375
5 Replace the Vertical Fruit Bearer 1 12 500
6 Attach the Horizontal Fruit Bearer 1 6600
7 Cleaning of manhole Fruit 1 85 000
B Work sleep manhole and Repair:
A sleep wall manhole / Repair Holes 1-8 1 63 000 Fruit
C Elevation Neck manhole / Handhole:
Elevation Up With 10 cm On Asphalt
1 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 301 650
2 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 533 000
3 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 301 650
4 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 533 000
5 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 410 000
Elevation Up With Asphalt At 20 cm
6 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 463 000
7 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 623 000
8 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 463 000
9 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 623 000
10 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 493 000
Elevation up to 30 cm in Asphalt
11 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 600 500
12 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 835 500
13 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 600 500
14 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 835 500
15 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 850 000
16 Making manhole cover ( cast iron material) Fruit 1 850 000
Elevation Up With 10 cm in berms
1 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 248 700
2 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 484 000
3 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 248 700
4 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 484 000
5 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 361 200

Up With the elevation of 20 cm in berms
6 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 398 000
7 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 562 000
8 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 398 000
9 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 562 000
10 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 432 000
Elevation up to 30 cm in berms
11 Close the manhole 1 Close Box ( HIS5) 100cmX100cm ex. Siemens / BICC Fruit 1 535 500
12 Close the manhole 2 Close Box ( HIS7) 200cmX100cm ex. Siemens / BICC Fruit 1 774 300
13 Close the manhole 1 Close Box / Round ( HIS5) New 90cmX90cm Fruit 1 535 500
14 Close the manhole 1 Close Box / Round ( HIS7) New 100cmX200cm Fruit 1 774 300
15 Close Handhole 3 Cover 180cm x 125cm New Fruit 1 801 100
D Making Handhole / manhole:
1 Making Handhole ( M + J) 1 3926500 Bauh
E Making Duct Depth 120cm Semi Route
Sami Duct Route 1 To 2 Pipe On Surface:
- Soil Meter 1 118 715 Ordinary
- Hardware Meters Land 1 121 000
- Asphalt Meter 1 125 000
- Hotmix Meter 1 135 000
- Paving Meter 1 123 000
2 Route Sami Duct For 4 Pipe On Surface:
- Soil Meter 1 210 000 Ordinary
- Hardware Meters Land 1 214 000
- Asphalt Meter 1 216 000
- Hotmix Meter 1 216 000
- Paving Meter 1 216 000
Route 3 Sami Duct Pipe On For 6 Surface:
- Soil Meter 1 310 000 Ordinary
- Hardware Meters Land 1 315 000
- Asphalt Meter 1 316 000
- Hotmix Meter 1 326 000
- Paving Meter 1 310 000

XVII SWITCHING OVER CUT WIRES Existing:
1 Cut Over Cable Duct including Jumper in MDF Pair 1 2400
2 Cut Over Cable Duct without Jumper in MDF Pair 1 1800
3 Cut Over KTTL including a jumper at the RK 1260 Pair
4 Cut Over KTTL without Jumper in RK Pair 1990
XVIII WORK DISASSEMBLY:
A Demolition Cable Air:
- Capacity 10 " / 0.6 / 0.8 Meter 1213
- Capacity 20 " / 0.6 / 0.8 Meter 1213
- Capacity 30 " / 0.6 / 0.8 Meter 1213
- Capacity 40 " / 0.6 / 0.8 Meter 1213
- Capacity 50 " / 0.6 / 0.8 Meter 1213
- Capacity 60 " / 0.6 / 0.8 Meter 1275
- Capacity 80 " / 0.6 / 0.8 Meter 1275
- Capacity 100 " / 0.6 / 0.8 Meter 1275
B Rehasbel Cable Air ( Hasbel From TELKOM) :
- Capacity 10 " Meter 1175
- Capacity 20 " Meter 1175
- Capacity 30 " Meter 1175
- Capacity 40 " Meter 1175
- Capacity 50 " Meter 1175
- Capacity 60 " Meter 1206
- Capacity 80 " Meter 1206
- Capacity 100 " Meter 1206
C Demolition Cable Duct ( An escape / Revocation and Rehasbel)
- Capacity 300 " Meter 1 1710
- Capacity 400 " Meter 1 1710
- Capacity 600 " Meter 1 1710
- Capacity 800 " Meter 1 2328
- Capacity 1000 " Meter 1 2328
- Capacity 1200 " Meter 1 2460
- Capacity 1400 " Meter 1 2460

BORING JOB XIX ( M + J) :
Galvanized Pipe Boring with a diameter of 5 " and 3.2 mm thick PVC Pipe 4" thick 2.2 mm with a depth of 150 cm
1 1 1 226 800 Meter Pipe
Pipe Meter 2 2 1 367 500
Pipe Meter 3 3 1 540 250
Pipe Meter 1 4 4 740 000

XX OPEN EXPOSURE:
A For KTTL:
1 With System Mechanic w / 10 " - 50" ( UC 3-5) Fruit 1 12 600
2 With System Mechanic w / 50 " - 100" ( UC 4-6) Fruit 1 12 600
3 With Mechanical System w / 200 " ( UC 6-9) Fruit 1 14 880
4 With Heat Wrinkle u / 10 " - 50" ( Youngjin 200) Fruit 1 7500
5 With Heat Wrinkle u / 50 " - 100" ( Youngjin 250) Fruit 1 10 800
6 With Heat Wrinkle u / 200 " ( Youngjin 500) Fruit 1 14 000
B To Cable Air:
1 With System Mechanic w / 10 " - 50" ( UC 3-5) Fruit 1 13 125
2 With System Mechanic w / 50 " - 100" ( UC 4-6) Fruit 1 13 125
3 With Mechanical System w / 200 " ( UC 6-9) Fruit 1 14 880
4 With Heat Wrinkle u / 10 " - 50" ( Youngjin 200) Fruit 1 7500
5 With Heat Wrinkle u / 50 " - 100" ( Youngjin 250) Fruit 1 10 800
6 With Heat Wrinkle u / 200 " ( Youngjin 500) Fruit 1 14 000
C for Primary Cables / Cable Duct:
1 With System Mechanic w / 300 " - 600" ( UC 6-18) Fruit 1 19 500
2 With System Mechanic w / 800 " - 1200" ( UC 8-18) Fruit 1 19 500
3 With System Mechanic u / 1400 " ( UC 8-24) Fruit 1 20 100

XXI CLOSURE CONNECTIONS ( SERVICES) :
A For KTTL:
1 With System Mechanic w / 10 " - 50" ( UC 3-5) Fruit 1 14 260
2 With System Mechanic w / 50 " - 100" ( UC 4-6) Fruit 1 14 260
3 With Mechanical System w / 200 " ( UC 6-9) Fruit 1 15 813
4 With Heat Wrinkle u / 10 " - 50" ( Youngjin 200) Fruit 1 10 900
5 With Heat Wrinkle u / 50 " - 100" ( Youngjin 250) Fruit 1 16 000
6 With Heat Wrinkle u / 200 " ( Youngjin 500) Fruit 1 18 500
B To Cable Air:
1 With System Mechanic w / 10 " - 50" ( UC 3-5) Fruit 1 14 880
2 With System Mechanic w / 50 " - 100" ( UC 4-6) Fruit 1 14 880
3 With Heat Wrinkle u / 50 " - 100" ( Youngjin 250) Fruit 1 11 500
4 With Heat Wrinkle u / 200 " ( Youngjin 500) Fruit 1 16 800
C for Primary Cables / Cable Duct:
1 With System Mechanic w / 300 " - 600" ( UC 6-18) Fruit 1 22 800
2 With System Mechanic w / 800 " - 1200" ( UC 8-18) Fruit 1 22 800
3 With System Mechanic u / 1400 " ( UC 8-24) Fruit 1 25 200

XXII testing 4 TIMES ON CABLE:
1 Primer Pair 1650
2 Secondary Pair 1700

XXIII SEAL FITTING END TO END OF TERMINATION OF CABLE ( M + J) :
A capacity of s / d 100 " Set 1 45 000
2 Capacity 200 " Set 1 45 000
3 Capacity 300 " Set 1 45 000
4 Capacity 400 " Set 1 61 200
5 Capacity 600 " Set 1 61 200
6 Capacity 800 " Set 1 61 200
7 Capacity 1000 " Set 1 75 000
8 Capacity 1200 " Set 1 75 000
9 Capacity 1400 " Set 1 75 000
FITTING END CAP XXIV ( SERVICES) :
Fitting End Cap 1 s / d 100 " Set 1 6600
2 Fitting End Cap 200 " s / d 600" Set 1 7440
3 Fitting End Cap 800 " s / d 1400" Set 1 8520

XXV Dig & FLOW KTTL with Deksten And Back While Urug
A depth of 80 cm ( M + J) :
1 On the Common Ground / Normal Meters 1 14 000
2 On Hard Surface Soil 1 15 750 Meters
3 On Rocky Ground Level Meters 1 16 250
4 On Asphalt Surface ( including stripping) Meter 1 16 000
5 On the Surface Hotmix ( including stripping) Meter 1 17 500
6 In a surface of 14 000 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 14 500
8 In 1 Meter Reinforced Concrete Surfaces 16 000
9 On the surface of a 14 600 Meters Garden
10 In Ceramic Surface 1 14 900 Meters

B Depth 100 cm ( M + J) :
1 On the Common Ground / Normal Meters 1 16 100
2 Meter On Hard Surface Soil 1 18 100
3 On Rocky Ground Level Meters 1 18 600
4 On Asphalt Surface ( including stripping) Meter 1 18 400
5 On the Surface Hotmix ( including stripping) Meter 1 20 100
6 In a surface of 16 100 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 16 600
8 In 1 Meter Reinforced Concrete Surfaces 18 400
9 On the surface of a 16 700 Meters Garden
10 In Ceramic Surface Meters 1 17 100

C. The depth of 110 cm ( M + J) :
1 On the Common Ground / Normal Meters 1 17 100
2 On Hard Surface Soil 1 19 300 Meters
3 On Rocky Ground Level Meters 1 19 750
4 On Asphalt Surface ( including stripping) Meter 1 19 500
5 On the Surface Hotmix ( including stripping) Meter 1 21 500
6 In a surface of 17 100 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 17 600
8 In 1 Meter Reinforced Concrete Surfaces 19 500
9 On the surface of a 17 700 Meters Garden
10 In Ceramic Surface 1 18 200 Meters

D depth of 120 cm ( M + J) :
1 On the Common Ground / Normal Meters 1 18 100
2 On Hard Surface Soil 1 20 500 Meters
3 On Rocky Ground Level Meters 1 21 000
4 On Asphalt Surface ( including stripping) Meter 1 20 600
5 On the Surface Hotmix ( including stripping) Meter 1 22 900
6 In a surface of 18 100 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 18 600
8 In Surface Reinforced Concrete 1 20 600 Meters
9 On the surface of a 18 700 Meters Garden
10 In Ceramic Surface 1 19 200 Meters

E Depth 150 cm ( M + J) :
1 On the Common Ground / Normal Meters 1 22 000
2 On Hard Surface Soil 1 25 000 Meters
3 On Rocky Ground Level Meters 1 25 600
4 On Asphalt Surface ( including stripping) Meter 1 25 100
5 On the Surface Hotmix ( including stripping) Meter 1 27 900
6 In a surface of 22 000 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 22 600
8 In Surface Reinforced Concrete 1 24 800 Meters
9 On the surface of a 22 700 Meters Garden
10 In Ceramic Surface 1 23 400 Meters

XXVI excavation EXPOSURE PLACE KTTL
A size 1.5 x 1.5 x 1.6 Meters:
1 On the Common Ground / Normal Point 1 153 000
2 On the Ground Hard Point 1 159 000
3 In the Surface Land Rocky Point 1 166 000
4 On Asphalt Surface ( including stripping) Point 1 173 000
5 On the Surface Hotmix ( including stripping) Point 1 176 000
6 In Block Paving Surface Point 1 163 000
7 At Rabat Concrete Surface / Point 1 165 000 Boneless
8 In Surface Point Park 1 153 000
9 In Ceramic Surface Point 1 165 000

Bed Size 1 x 1.5 x 1.3 Meters:
1 On the Common Ground / Normal Point 1 48 400
2 On the Ground Hard Point 1 51 700
3 On Ground Level 1 52 800 Rocky Point
4 On Asphalt Surface ( including stripping) Point 1 64 900
5 On the Surface Hotmix ( including stripping) Point 1 70 500
6 In Block Paving Surface Point 1 55 000
7 At Rabat Concrete Surface / Point 1 56 100 Boneless
8 In Surface Point Park 1 48 400
9 In Ceramic Surface Point 1 56 100

C Size of 1 x 1.5 x 1.2 Meters:
1 On the Common Ground / Normal Point 1 43 500
2 On the Ground Hard Point 1 46 500
3 On Ground Level 1 47 500 Rocky Point
4 On Asphalt Surface ( including stripping) Point 1 58 400
5 On the Surface Hotmix ( including stripping) Point 1 63 400
6 In Block Paving Surface Point 1 49 500
7 At Rabat Concrete Surface / Point 1 50 400 Boneless
8 In Surface Point Park 1 43 500
9 In Ceramic Surface Point 1 50 400

D Size 1 x 1.1 x 1.1 Meters:
1 On the Common Ground / Normal Point 1 43 000
2 On the Ground Hard Point 1 45 000
3 On Ground Level 1 46 500 Rocky Point
4 On Asphalt Surface ( including stripping) Point 1 58 000
5 On the Surface Hotmix ( including stripping) Point 1 63 000
6 In Block Paving Surface Point 1 49 000
7 At Rabat Concrete Surface / Point 1 50 000 Boneless
8 In Surface Point Park 1 43 000
9 In Ceramic Surface Point 1 50 000

E Size 1 x 1.1 x 0.9 Meters:
1 On the Common Ground / Normal Point 1 36 550
2 On the Ground Hard Point 1 38 200
3 On Ground Level 1 39 500 Rocky Point
4 On Asphalt Surface ( including stripping) Point 1 49 300
5 On the Surface Hotmix ( including stripping) Point 1 53 500
6 In Block Paving Surface Point 1 41 600
7 At Rabat Concrete Surface / Point 1 42 500 Boneless
8 In Surface Point Park 1 36 500
9 In Ceramic Surface Point 1 42 500

XXVII reconditioning BEYOND ITS AUTHORITY excavation PU:
1 On the Common Ground / Normal Meter 1 3200
2 On Hard Surface Soil Meter 1 4200
3 On Rocky Ground Level Meter 1 4400
4 On Asphalt Surface ( including stripping) Meter 1 26 070
5 On the Surface Hotmix ( including stripping) Meter 1 39 240
6 In a surface of 11 250 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 18 975
8 In Surface Reinforced Concrete 1 30 625 Meters
9 On the surface of a 19 500 Meters Garden
10 In Ceramic Surface 1 32 500 Meters

XXVIII Recondition Connecting excavation POINT BEYOND ITS AUTHORITY PU:
1 On the Common Ground / Normal Meter 1 6000
2 On Hard Surface Soil Meter 1 8000
3 On Rocky Ground Level Meter 1 8500
4 On Asphalt Surface ( including stripping) Meter 1 46 500
5 On the Surface Hotmix ( including stripping) Meter 1 54 500
6 In a surface of 18 000 Meter Block Paving
7 On Concrete Surface Rabat / Boneless Meters 1 33 000
8 In Surface Reinforced Concrete 1 48 500 Meters
9 On the surface of a 38 500 Meters Garden
10 In Ceramic Surface 1 52 000 Meters

XXIX PIPE FITTING FOR A CROSS-ROAD CROSSING ( PVC) :
Pipe Diameter 4 " Thickness 5.5 mm ( M + J) :
1 1 1 41 000 Meter Pipe
2 2 1 79 250 Meter Pipe
Pipe Meter 3 3 1 117 400
Pipe Meter 1 4 4 160 000

CROSS XXX trench / SMALL RIVER WITH GALVANIS:
Span 1 s / d 5.5 mtr thickness 3.2 mm ( M + J) :
1 1 Pipe diameter of 2 " Meters 1 40 800
Pipe diameter 2 1 3 " 1 66 000 Meters
Pipe diameter 3 1 4 " 1 85 200 Meters
Pipe diameter of 2 4 2 " Meter 1 77 400
Pipe diameter 5 2 3 " Meter 1 114 000
Pipe diameter 6 2 4 " Meter 1 168 000

XXXI revamping TRACT OF LAND:
1 Meregel KU capacity of 10 " -20" Meter 1125
2 Meregel KU capacity of 30 " -50" Meter 1131
3 Meregel KU capacity of 60 " -80" Meter 1156
4 Meregel KU capacity of 100 " Meter 1262
5 Meregel Drop Wire 100 m First SSL 1 3240
6 Withdrawal First Line Penanggal SSL 1 100 m 15 000
7 Withdrawal Next 50 m channel Penanggal SSL 1 8000
Demolition Channel 8 Penanggal 100 m First SSL 1 3000
Channel 9 Offloading SSL Penanggal Next 50 m 1 1200
Over 10 Drop Wire Cut SSL 1300

Duct REPAIR XXXII ( M + J) :
1 For a PVC Pipe 4 " thick 2.2 mm 1 112 500 Meters
2 For 2 PVC Pipe 4 " thick 2.2 mm 1 125 000 Meters
3 To 3 PVC Pipe 4 " thick 2.2 mm 1 162 500 Meters
4 For 4 PVC Pipe 4 " thick 2.2 mm 1 178 750 Meters
5 For 5 PVC Pipe 4 " thick 2.2 mm 1 231 250 Meters
6 To 6 PVC Pipe 4 " thick 2.2 mm 1 253 750 Meters
7 To 7 PVC Pipe 4 " thick 2.2 mm 1 287 500 Meters
8 To 8 PVC Pipe 4 " thick 2.2 mm 1 308 750 Meters

XXXIII CABLE SERVICE REPAIR WORK:
Primer 1 Repair Cable / Duct Pair 1720
2 Replace the Primer Pair Cable Connector 1360
3 Cable Repair Secondary / Primary KTTL Pair 1720
4 Replace Connector Pair 1360

XXXIV MEASUREMENT SERVICE: ( ADDITIONAL)
A Primer On Network
1 ISOLATION Pair 1236
2 CONTINUITY Pair 1147
3 Pair 1 6956 CROSS TALK
Pair a fourth PRISONERS LOOP 1925
5 PRISONERS SCREEN Pair 1 2021
Pair a damping 6 2782

B The Secondary Network
1 ISOLATION Pair 1238
2 CONTINUITY Pair 1221
CROSS TALK Pair 3 1 13 855
Pair a fourth PRISONERS LOOP 3370
5 PRISONERS SCREEN Pair 1 2865
Pair a damping 6 3434
7 TRANSPORTATION RIT 1 62 500

XXXV OTHER:
Figure 1 Final Implementation:
- Tracing ( Figure Final Implementation) A1 / AO lbr 1 42 500
- Blu Print Size A1 / AO lbr 1 4500
- Binding Books 1 12 500
2 Rent Pick Up In Town RIT 1 62 500
3 Rental Pick Up In Outer City Datel RIT 1 90 625
4 Rent Pick Up to Madura RIT 1 118 750
5 Rental Truck In Town RIT 1 162 500
6 Outer City Truck Rental In Datel RIT 1 218 750
7 Rent a Truck to Madura RIT 1 306 250

other info related to the copper cable networks can be viewed on our company' s product catalog or hub. we:
You have [3] new inquiries.
Go to Member Menu
Home - Trade List - Product List - Inquiry List - Cooperation List - Company List
Copyright © 2024 Indotrade.co. All Rights Reserved.