Free Member
Language :
Baja Organik l Composter l Mesin Process Organik -www.kencanaonline.comBaja Organik l Composter l Mesin Process Organik -www.kencanaonline.com
http://indotrade.co/kms-bhd/
Contact Information
Name:

Mr. Mohamed Saiful [Marketing]

E-mail:
Homepage:

Instant Messaging:

Y!: brand_mngr 
Phone Number:

Phone number of Mr. Mohamed Saiful at Selayang Selangor Malaysia

Mobile Number:

Mobile number of Mr. Mohamed Saiful at Selayang Selangor Malaysia

Fax Number:

Fax number of Mr. Mohamed Saiful at Selayang Selangor Malaysia

Address:

No 25 Jalan 3 A /2 B, Taman Desa Bakti, Batu Caves
Selayang Selangor Malaysia 68100, Selangor
Malaysia

Indonesia Head Office: Jl Pungkur 115 B Bandung 40251, Ph + 62-81572527115-811208648
Average User Review
There is no review for this company Write a review

Sell

Bio Electric Installation BD 5000L[Jul. 29, 2011 21:57:49]
PriceRp.41.950.000,- ( Factory Bandung)
Quantity Order:
Payment MethodTelegraphic Transfer (T/T)
QuantityPer 1 unit
Pack. & DeliveryWood Pallet
OriginIndonesia
The use of simple tools and technology in the biogas project so far has strengthened the perception as if the biogas is only intended for the processing of cow feces of small-scale farms. In fact, the actual technology in the generation of biogas is equivalent to replacing the fuel LPG and other fossil fuel sources.

One effort to provide alternative energy, biogas generation needs to be built in a modern installation with the installation of which BioElektrik BD 5000L.

Bio Electrical Installation 5000 L feasible by individuals, cooperatives and commercial district management company ( the vegetable market, malls, hotels, restaurants, residential blocks, apartments, farm, planters, SMEs producing food waste and other commercial areas) or the area manager of social ( hospitals, schools, the authority managing the rivers and lakes, or other parties that have waste in their production process or a problem with waste, as well as, problems in waste management.

Installation of Bio Electronics 5000L consists of a units of 5000-liter digesters, biogas purification unit 2 ( methane purifier) MP 12 135 ( PVC) , the gas holder capacity of 5 m3, a unit of BG 2500 generator w ( biogas power generator 2500 watts) , bacterial methane activators GP-7 for 1 month and equipment installation to the stove and generator units. Bio Electrical Installation BD 5000L enabled to process waste biomass or organic waste for the first time only 5 m3 ( equivalent weight of 1.5 tons) and the next day, 1 m3 or 0.3 tons / day. Various types of waste or biomass is good for energy generation, especially material containing high cellulose, which includes domestic kitchen waste ( organic type) , feces of cattle dung, feces / septic tanks, weed the garden and weeds like water hyacinth, fruit juice production process wastes, and various foods, as well as waste from various plants and other livestock. Every day, Installing BD 5000 L produce biogas on a purity> 80% methane ( CH4) as much as 9 m 3, having a high flame and calories as a material for cooking stove is equivalent to 4.14 kg of LPG, or fuel gas can turn on a 1000 watt generator unit as much as 10.8 KWH ( kilo watt hour) . In addition to revenue from sales of fuel gas or electric energy above, the installation of BD 5000L produces mud ( slurry) with the quality of organic liquid fertilizer as much as 1 m 3 / day. This sludge can be enhanced by adding thereto various bacteria ( fastening N2, the solvent phosphate and KCL) or substance grown, so has the added value ( added value) as a biological fertilizer or organic fertilizer. The garbage and waste management goals, 5000L BD installations will have opporunity cost of waste disposal costs that were previously run into the landfill waste.
You have [3] new inquiries. Go to Member Menu
Home - Trade List - Product List - Inquiry List - Cooperation List - Company List
Copyright © 2024 Indotrade.co. All Rights Reserved.