Welcome to
free land

Free Member
free land
Indonesia
  • Sell

    SOFT CORPORATE OFFER Iron Ore biji besi fe 63-61

    SOFT CORPORATE OFFER Iron Ore biji besi fe 63-61

    Quantity Order:
    SOFT CORPORATE OFFER
    Iron Ore II

    Dearest : BUYER IRON ORE

    We, FREE LAND is in collaboration with a lot of direct miners, from my direct miner with the new funder, confirmed with SOFT CORPORATE OFFER responsibility, that we are ready, and capable to enter into a contract to sell the commodity, with the following terms, conditions and specifications as stated below. The sales and purchase contract would be in accordance with international standards and procedures
    Willing and able to enter into contractual agreement with the Buyer for the sales of the following commodity as follows:

    Terms and Conditions :
    Commodity : Indonesian Iron Ore
    Origin : South Kalimantan, Indonesia
    Packing : Lumps
    Unit Price Fe 63-61 : USD 77, -/ MT, FOB Mother Vessel
    Payment : By Cash 50% - 40% - 10%
    System Payment : 50 % cash ( in sign contract) with the guarantee stock management transfer to the Buyer by the Miner is 50% of the total quantity of contract and confirmed by Notary.
    40% cash ( in stockpile port, South Kalimantan, Indonesia) .
    10% cash ( Document Complete in Vessel) .

    Unit Price Fe 63-61 : USD 83, -/ MT, FOB Mother Vessel
    Payment : By L/ C, PB 2% By Seller

    Spesification ( in accord with ISO standart )
    NO. PARAMETER UNIT TEST RESULT TEST METHOD
    1 Moisture Content % wt 5.89 Oven Drying 1050 to Constant Weight
    2 Total Fe % wt 63.01 ISO 2597 - 1 : 94
    3 SiO2 % wt 3, 50 ISO 2598 - 1 : 92
    4 Al2O3 % wt 2.06 ISO 4698 – 1 : 92
    5 TiO2 % wt 0.17 ISO 4691 : 85
    6 Phosporous ( P) % wt 0.02 ISO 46870 - 1
    7 Sulfur ( S) % wt 0.06 ISO 4690 : 86
    8 Size 0 – 20 mm % wt 13.0 ISO

    Price Adjustment : Every Shipment Depend the Market Price.
    Capacity : 40.000 MT / Shipment / Month.
    Contract Period : 12 Month, Subject to Succesfull Performance of First
    Shipment.
    Transhipment : 300 ft barge.
    Iron Ore Source : From South Kalimantan.
    Loading Port Substitute : Lac, Power City, Kodeco, Batu Licin South Kalimantan.
    Loading Rate ( Jetty ) : 2, 500 MT PWWD SHINC.
    Loading Rate ( Anchorage ) : 7, 000 MT PWWD SHINC.
    Anchorage : Muara Satul open sea, Tg. Pemancingan, South Kalimantan.
    Inspection : Quality and Quantity determined at Barge by an Acceptable Independent Surveyor ( GEOSERVICE LTD ) . All of cost and Charges of Inspection incurred will be Distributed by Seller.

    Validity : Within 3 ( three ) working days from issuring date.
    -.Price should be evaluated in every month for annual contract.
    -.In case that Indonesian Government impose Iron Ore Export Tax, the Unit Price Will increase accordingly.
    -.Site Visit : Can be arranged at Buyer’ s cost after Contract Signing.

    We hear by good news from you soon as possible and please do not hesitate to contact us for future information , thanks for your kind attention and co-operations.

    Please send us your draft contract and then the draft LC or the draft SBLC for this transaction and all relevant documents as soon as possible, your immediate attention and confirm your readiness is appreciated. after you deliver your draft, you can correlate directly with my direct miner.

    Truly Yours,

    MUHAMMAD YUSUF


You have [3] new inquiries.
Go to Member Menu

Home - Trade List - Product List - Inquiry List - Cooperation List - Company List
Copyright © 2024 Indotrade.co. All Rights Reserved.