Welcome to
PT CIPTA VISI SINAR KENCANA

Free Member
PT CIPTA VISI SINAR KENCANA
Indonesia
  • Sell

    BerSeka Reactor Instalation

    Price:
    Rp.46.000.000,-
    Quantity Order:
    Origin:
    Indonesia
    Payment Method:
    Cashier Order
    Quantity:
    5
    Pack. & Delivery:
    -
    Mini Bio Reactor Reducing ability is only in 5-6 days. The reaction that process will finish and the moment, and can be enhanced again with additional garbage. On days 7th, the garbage in it is still wet, damp and sticky so that if will be thrown require to be kept in calm place so that hitting the wind and also cover with tidiness sack for windy. Hence in a few day later, then (generally 3-5 day) result of processed garbage that is wet before, become to run dry, not stingky and loose. If it going to be used as Milioran, like compost or land crumbleled, sieve that decomposition untill the small item and large item separated. Dissociating part of large size garbage and plastic to thrown to Dustbin. Put the small size result to the packing which planned before. Then you will have a compost like amillioran (This can be used as crumble in the back yard or can be sold too)


You have [3] new inquiries.
Go to Member Menu

Home - Trade List - Product List - Inquiry List - Cooperation List - Company List
Copyright © 2024 Indotrade.co. All Rights Reserved.